Solved:Question: Company A has received 50 x 5 m, 30 x 7 m, 20 x 8 m cable order in the current planning period. C……

Company A has received 50 x 5 m, 30 x 7 m, 20 x 8 m cable order in the current planning period. Cables are obtained by cutting from 20 meters rolls. What type cutting plan should be developed to minimize wastage? (It will be solve by column generation. If the optimal solution cannot be reached at the end of the second iteration, the results of the iteration will be considered optimal, and the results will be summarized.) (this is deterministic operations research question)

Scroll to top